Skip to main content
PT Intan Nusantara Indonesia Home PT Intan Nusantara Indonesia
Quote

Coal Buyer Knowledge Center

Reference material for procurement desks, utility engineers, and energy trading teams evaluating Indonesian steam coal: specification guides, statutory compliance checklists, logistics parameters, and verified operational data.

Frequently Asked Questions

Institutional knowledge base across eight core domains: Product, Supply, Commercial, Logistics, Quality, Compliance, Advisory, and Partnership.

SHOWING: 40 OF 40 ENTRIES
• •

We supply eight standardized export grades spanning low-grade to high-calorific sub-bituminous and bituminous coal: GAR 3800, GAR 4200, GAR 4600, GAR 5000, GAR 5500, GAR 5800, GAR 6000, and GAR 6300+ kcal/kg. These cover both single-seam run-of-mine allocations and custom blended formulations suited for pulverized coal (PC), circulating fluidized bed (CFB), and industrial boilers.

Related Documentation: Explore Section

Every cargo is tested against full proximate and ultimate parameters: Gross Calorific Value (GAR/NAR/ADB), Total Moisture (TM ARB 12%–38%), Inherent Moisture (IM ADB), Ash Content (ADB/ARB 4%–16%), Volatile Matter (VM ADB 36%–44%), Fixed Carbon (FC), Total Sulfur (TS ARB 0.2%–1.0%), Hardgrove Grindability Index (HGI 45–60), and Ash Fusion Temperatures (IDT, ST, HT, FT >1,150°C–1,250°C). All testing follows ASTM and ISO standards.

Related Documentation: Explore Section

Supply originates from 21 partner concessions covering >22,292 hectares in the South Kalimantan and East Kalimantan coal basins (Tapin, Banjar, Tanah Laut, Tanah Bumbu, Kotabaru, and Kutai Kartanegara). All partner concessions hold verified, valid IUP-OP (Izin Usaha Pertambangan Operasi Produksi) or PKP2B concessions registered in the Ministry of Energy and Mineral Resources (ESDM) MODI/MOMIB database.

Related Documentation: Explore Section

Our technical team conducts a comparative parameter audit against your boiler design baseline (slagging index, fouling factor, mill pulverization limits via HGI, sulfur limits for flue-gas desulfurization, and moisture handling tolerances). If an individual concession run-of-mine seam has variance, we coordinate controlled jetty stockpile blending to deliver consistent cargo within contractual tolerance.

Related Documentation: Explore Section

Quality verification occurs in three continuous phases: (1) pit-face and stockpile channel sampling prior to barging, (2) automatic mechanical falling-stream sampling at the partner river jetty conveyor head adhering to ISO 13909 / ASTM D2234, and (3) independent final verification by internationally accredited surveyors (SGS, Sucofindo, Carsurin, or Surveyor Indonesia) during mother vessel transshipment.

Related Documentation: Explore Section

Supply availability is governed by approved annual mine work plans (RKAB) and seasonal river transit drafts. Across our 21 partner pits in South and East Kalimantan, baseline production capacity ranges from 150,000 MT to over 400,000 MT monthly depending on grade. Spot parcels and term quotas are allocated against confirmed stockpile physical inventory. Specific monthly quotas are confirmed per inquiry.

Related Documentation: Explore Section

We accommodate all standard dry bulk vessel categories loaded via offshore transshipment anchorages: Handymax/Supramax parcels (50,000 to 58,000 MT ±10%), Ultramax vessels (60,000 to 65,000 MT ±10%), Panamax bulkers (70,000 to 80,000 MT ±10%), and deepwater Cape-size transshipment (120,000 to 180,000 MT) at sheltered deep sound anchorages such as Tanjung Pemancingan.

Related Documentation: Explore Section

Spot Cargo is a single prompt vessel shipment (e.g., 55,000 MT Supramax) with a fixed 10-day laycan, pricing locked on transaction date, and immediate stockpile drawdown. Contract Supply is a multi-month or annual commitment (e.g., 50,000–100,000 MT/month) providing reserved seam capacity, scheduled laycan rotation, price index linking (ICI 1–5 or fixed collar), and priority berthing at loading terminals.

Related Documentation: Explore Section

Supply continuity rests on: (1) dedicated mine seam block assignment under Joint Operation (KSO) arrangements, (2) multi-pit blending buffers ensuring backup supply if one pit encounters weather or maintenance delays, (3) forward barging commitments with dedicated tug & barge sets, and (4) strict adherence to ESDM Domestic Market Obligation (DMO) clearances so export quotas remain unencumbered.

Related Documentation: Explore Section

Cargo allocation follows a strict chronological protocol: (1) Buyer submits formal LOI or Request for Quote specifying grade, volume, and target laycan, (2) PT-INI conducts pit inventory verification and reserves the tonnage, (3) A binding Firm Corporate Offer (FCO) is issued with a 72-hour validity window, and (4) Upon SPA signing and operative financial instrument receipt, cargo is physically tagged at jetty stockpiles.

Related Documentation: Explore Section

Our primary export trade terms are: (1) FOB Mother Vessel Trimmed (Free On Board at designated Kalimantan offshore anchorage, seller bears all river barging, transshipment, floating crane costs, and export duties), (2) FOB Barge (seller loads and trims onto buyer’s barge at river jetty), and (3) CFR / CIF (Cost and Freight / Insurance to destination discharge port, arranged via trusted bulk shipowners).

Related Documentation: Explore Section

Export prices are structured under two frameworks: (1) Index-Linked Pricing tied to the weekly Indonesian Coal Index (ICI 1, 2, 3, 4, or 5 published by Argus/Coalindo) with agreed premium or discount based on chemical specifications, or (2) Fixed Commercial Price for prompt spot laycans. All prices are calculated in US Dollars (USD) per metric ton.

Related Documentation: Explore Section

We accept: (1) 100% Irrevocable Documentary Letter of Credit (L/C at sight, governed by UCP 600) issued by a top-tier international bank, payable against presentation of original shipping documents, or (2) Structured Telegraphic Transfer (T/T via SWIFT) with an advance mobilization deposit (10%–20%) and the balance payable against copy of clean on-board Bill of Lading and surveyor COA/COW. All export foreign exchange complies with PP No. 21/2026 (DHE SDA).

Related Documentation: Explore Section

Yes. We routinely execute single-vessel trial shipments (typically 50,000 to 55,000 MT Supramax) to allow buyer technical and commercial teams to test combustion performance, boiler compatibility, and operational delivery reliability under full standard SPA terms before entering annual term contracts.

Related Documentation: Explore Section

Our commercial transaction procedure follows 5 sequential steps: (1) Issuance of Soft Corporate Offer (SCO) to Buyer, (2) Buyer Acceptance or Feedback where Buyer countersigns/redlines and returns to email@pt-ini.com, (3) Countersignature & Draft SPA Issuance by Seller, (4) SPA Finalization & Execution where Buyer transmits signed SPA to email@pt-ini.com, and (5) Contract Commencement for operational and logistical execution.

Related Documentation: Explore Section

Standard export contracts establish an initial 10-day laycan window at SPA signing. At 15 days prior to the first day of the initial window, the buyer narrows this to a definitive 5-day laycan window. Laytime starts counting 12 hours after Notice of Readiness (NOR) is tendered or upon vessel berthing/commencement of loading, whichever occurs first (WWD SHINC terms).

Related Documentation: Explore Section

Our primary river loading corridors are along the Barito River, Tapin River, and coastal channels of South Kalimantan, with direct logistics access to Banjarmasin, Satui, and Batulicin. From river jetties, coal is barged directly to offshore deepwater anchorages for ocean bulk carrier loading.

Related Documentation: Explore Section

We operate through 10 partner river jetty terminals in South Kalimantan equipped with automated radial telescopic conveyor systems (loading rates from 800 to 1,500 MT/hour, such as PT Tapin Coal Terminal and PT Talenta Bumi) as well as mechanical excavator loading wharves. These jetties accommodate 300ft to 330ft bulk coal barges (7,500 to 10,000 DWT).

Related Documentation: Explore Section

Offshore anchorages have zero air draft restrictions. Water depths range from 12.0 meters to over 22.0 meters at low water spring tide, accommodating Geared Supramax (draft ~12.8m), Ultramax (~13.3m), Panamax (~14.5m), and Capesize bulkers. Geared bulkers can use ship gear with grabs; gearless bulk carriers are loaded using floating transshipment cranes.

Related Documentation: Explore Section

Standard contractual loading rates at anchorage are 15,000 to 20,000 MT per weather working day (WWD SHINC) for Supramax and Ultramax bulkers, and 20,000 to 25,000 MT/day for Panamax vessels utilizing high-capacity floating cranes equipped with 25–35 MT grabs.

Related Documentation: Explore Section

We operate across 4 verified deepwater transshipment anchorages in South Kalimantan waters: (1) Taboneo Anchorage (03°41'00" S / 114°28'00" E, depth 14–18m), (2) Asam Asam Anchorage (03°55'00" S / 115°06'00" E, depth 12–16m), (3) Muara Satui Anchorage (03°54'00" S / 115°29'00" E, depth 14–17.5m), and (4) Tanjung Pemancingan / Pulau Laut (03°12'00" S / 116°18'00" E, depth 16–22m, sheltered sound).

Related Documentation: Explore Section

Typical sailing times for bulk carriers loaded at South Kalimantan anchorages are: 8–11 days to Southern China (Guangzhou, Fangcheng), 11–14 days to Northern China (Qingdao, Caofeidian), 12–15 days to East Coast India (Paradip, Krishnapatnam), 16–19 days to West Coast India (Mundra, Kandla), 5–7 days to Southern Vietnam, and 6–8 days to Thailand (Map Ta Phut).

Related Documentation: Explore Section

Sampling adheres strictly to ISO 13909 (Hard coal and coke: Mechanical sampling) or ASTM D2234. We utilize automated falling-stream mechanical cross-belt samplers at the jetty conveyor discharge head during barge loading, taking systematic increments proportional to flow. Static stockpile manual sampling is prohibited for final export determination.

Related Documentation: Explore Section

Testing is conducted in ISO/IEC 17025 accredited laboratories using standard ASTM or ISO methodologies: Calorific value by Bomb Calorimetry (ASTM D5865 / ISO 1928), Total Moisture by two-stage oven drying (ASTM D3302 / ISO 589), Ash by furnace ignition (ASTM D3174 / ISO 1171), Volatile Matter (ASTM D3175 / ISO 562), Total Sulfur by IR/LECO (ASTM D4239 / ISO 19579), and HGI (ASTM D409).

Related Documentation: Explore Section

All export shipments are independently inspected, sampled, and tested by mutually agreed third-party surveyors: SGS, Sucofindo, Carsurin, or Surveyor Indonesia. The chosen surveyor is appointed under clear bipartite or tripartite instructions and acts as the sole referee authority.

Related Documentation: Explore Section

The independent surveyor issues two fundamental binding certificates: (1) Certificate of Sampling and Analysis (COA), certifying all chemical, calorific, proximate, and sizing parameters, and (2) Certificate of Weight (COW), determining exact metric tonnage via initial, intermediate, and final vessel draft surveys conducted in conjunction with ship’s officers.

Related Documentation: Explore Section

Standard SPA terms specify guaranteed specifications and rejection limits. If actual loaded GAR deviates from contract specification but remains above the rejection limit, a linear pro-rata price adjustment formula is applied. If moisture exceeds contract limits, a weight deduction is made from invoice tonnage. If sulfur or ash exceeds absolute rejection thresholds, buyer has the contractual right to reject cargo or renegotiate commercial terms.

Related Documentation: Explore Section

PT-INI holds active Coal Registered Exporter approval (Eksportir Terdaftar Batubara) No. 03.ET-04.24.0202 issued by the Ministry of Trade (valid through 2027), operates under verified IUP-OP titles registered in ESDM MODI, and generates electronic Non-Tax State Revenue (e-PNBP SIMPONI) payment vouchers required for export clearance.

Related Documentation: Explore Section

For buyer due diligence we provide: (1) Company Registration Dossier (NIB, AHU Corporate Deed from Ministry of Law and Human Rights), (2) Ministry of Energy and Mineral Resources (ESDM) MODI database registration confirmation, (3) Tax Identification Number (NPWP) and Tax Compliance Status (KSWP), and (4) Corporate banking reference letters upon execution of mutual NDA/KYC.

Related Documentation: Explore Section

Official customs clearance requires: (1) Customs Export Declaration (Pemberitahuan Ekspor Barang - PEB), (2) Customs Export Release Permit (Nota Pelayanan Ekspor - NPE), (3) Mandatory Surveyor Verification Report (Laporan Surveyor - LS) verifying domestic royalties and source IUP validity, and (4) Proof of PNBP royalty settlement via SIMPONI.

Related Documentation: Explore Section

The complete documentary package presented under L/C or T/T consists of: (1) 3/3 Original Clean on Board Ocean Bills of Lading, (2) Signed Commercial Invoice, (3) Packing List / Weight Certificate, (4) Surveyor Certificate of Sampling & Analysis (COA), (5) Surveyor Certificate of Weight (COW), (6) Certificate of Origin (COO Form E / Form AK / ICO), (7) Cargo Hold Cleanliness Inspection Certificate, and (8) Master’s Statement of Facts (SOF).

Related Documentation: Explore Section

Our procurement advisory desk assists overseas utilities and trading houses in structuring annual procurement schedules, evaluating forward price risk, analyzing seasonal river barging risks (dry season low drafts vs monsoon rain surges), and selecting optimal delivery terms to minimize demurrage and overall landed energy costs ($/GJ).

Related Documentation: Explore Section

Indonesian coal trading often suffers from speculative multi-tier broker chains. Our sourcing advisory provides direct Know-Your-Supplier (KYS) audits, verifies mine title legitimacy in the ESDM MODI system, inspects physical stockpile availability, and verifies that the mining concession holds approved annual production quotas (RKAB) before buyers commit funds.

Related Documentation: Explore Section

We provide market intelligence on Indonesian domestic coal regulations, Domestic Market Obligation (DMO) policies, ESDM benchmark prices (HBA), Argus/Coalindo Indonesian Coal Index (ICI 1–5) weekly trends, freight chartering trends, and transshipment floating crane availability.

Related Documentation: Explore Section

We support market entry by structuring standard Indonesian SPA contracts that protect buyer interests, navigating Bank Indonesia foreign exchange repatriation regulations (PP No. 21/2026 DHE SDA), establishing compliant L/C wording acceptable to Indonesian foreign exchange banks, and coordinating third-party surveyor protocols.

Related Documentation: Explore Section

We structure 1-year to 5-year off-take agreements, joint operations (KSO - Kerja Sama Operasi), and dedicated concession allocations. Terms include contracted annual volume baselines, preferred laycan scheduling priority, transparent cost-plus or index-linked pricing formulas, and dedicated stockpile yardage.

Related Documentation: Explore Section

PT-INI works as a supply-side partner on the ground in South Kalimantan. We coordinate directly with concession titleholders, jetty managers, tug & barge fleets, and shipping agents to maintain complete operational transparency and physical chain-of-custody control.

Related Documentation: Explore Section

Yes. We offer customized buyer-specific procurement representations where our South Kalimantan and Makassar commercial desks represent you in Indonesia, auditing pits, coordinating blended calorific shipments to meet strict boiler emission limits, and managing all statutory export permits.

Related Documentation: Explore Section

Yes. For qualified institutional buyers and energy consortiums seeking direct source equity or off-take security, we structure production sharing and capital-supported Joint Operations (JO) covering mining fleet mobilization, dedicated haul road maintenance, and jetty stockpile expansion.

Related Documentation: Explore Section

Yes. We encourage technical and executive buyer delegates to participate in our structured South Kalimantan Concession Site Visit program (fixed fee IDR 8,500,000/day for 1–4 delegates) to physically inspect active open-pit mines, coal seams, river stockpiles, conveyor jetties, and laboratory facilities.

Related Documentation: Explore Section

7 International Buyer Guides

Curated educational manuals covering combustion chemistry, price index mechanics, maritime delivery rules, statutory export clearance, and laboratory quality standards.

7 PEER-REVIEWED TECHNICAL MANUALS
Guide 01 · Combustion Chemistry Featured Core Manual
ISO 1928 / ASTM D5865 / ASTM D3172
Calorific Matching & Combustion Chemistry

Coal Specification Guide

Framework for evaluating Indonesian sub-bituminous and bituminous coal grades (GAR 3800 to 6300+ kcal/kg). Explains moisture trade-offs, volatile matter reactivity, and ash fusion slagging limits.

Key Operational Focus
  • Moisture vs Calorific balance (Total Moisture 12% to 38% ARB)
  • Volatile Matter (VM 36%–44% ADB) and flame propagation stability
  • Ash Fusion Temperatures (IDT, ST, HT, FT >1,150°C) to prevent furnace slagging
  • ASTM D5865 & ISO 1928 Bomb Calorimetry precision methods
Guide 02 · Market Intelligence
ESDM Regulations / ICI Benchmarks / PP 21/2026
Supply Basins, Pricing Indices & Regulations

Indonesian Coal Market Guide

Overview of the Indonesian coal export market: South & East Kalimantan geological basins, Indonesian Coal Index (ICI 1–5) price setting, Domestic Market Obligation (DMO), and annual RKAB mine quotas.

Key Operational Focus
  • South Kalimantan vs East Kalimantan coal seam characteristics
  • Understanding Argus/Coalindo ICI 1 to ICI 5 pricing benchmarks
  • ESDM Annual Work Plan & Budget (RKAB) production quota mechanics
Guide 03 · Commercial Contracts
ICC Incoterms 2020 / UCP 600 Maritime Rules
Risk Allocation, Demurrage & Cargo Settlement

Incoterms & Delivery Guide

Practical operational guide on executing FOB Barge, FOB Mother Vessel Trimmed, and CFR/CIF shipments from South Kalimantan waters under Incoterms 2020 rules.

Key Operational Focus
  • FOB Mother Vessel Trimmed point of title & risk transfer at anchorage
  • Laytime calculation rules (WWD SHINC) & Notice of Readiness (NOR) protocols
  • Demurrage & despatch mechanisms under standard SPA terms
Guide 04 · Procurement Strategy
Standard International Coal SPA / ESDM Guidelines
12-Stage Sourcing Methodology & Due Diligence

Coal Procurement Guide

Step-by-step buyer roadmap from boiler constraint definition, counterparty KYS audit, and commercial term sheet structuring, through physical transshipment to final discharge port settlement.

Key Operational Focus
  • Supplier title verification in ESDM MODI/MOMIB database
  • Eliminating multi-tier speculative intermediary broker chains
  • Negotiating linear calorific pro-rata price adjustment clauses
Guide 05 · Statutory Documentation
Ministry of Trade / Directorate General of Customs / UCP 600
Statutory Clearance & Banking Presentation Package

Export Documentation Guide

Breakdown of the 10 core export shipping documents required for destination customs release, import tariff preference, and international banking negotiation under L/C.

Key Operational Focus
  • Clean on Board Ocean Bill of Lading (3/3 originals issued by Master)
  • Certificate of Sampling & Analysis (COA) issued by SGS/Sucofindo
  • Certificate of Origin (COO Form E for China, Form AK for Korea, ICO)
Guide 06 · Maritime Logistics
BIMCO Charterparty Standards / Harbor Master Rules
River Barging to Deepwater Transshipment

Shipping & Laycan Guide

Operational manual detailing river transit draft restrictions, automated conveyor loading rates at 10 partner jetties, floating crane transshipment, and deepwater anchorage nautical parameters.

Key Operational Focus
  • Taboneo, Asam Asam, Muara Satui, and Tanjung Pemancingan coordinates
  • Maximum draft allowances and vessel class compatibility (Handymax to Capesize)
  • Floating crane loading rates (15,000 to 25,000 MT/day WWD SHINC)
Guide 07 · Quality Assurance
ISO/IEC 17025 / ASTM D2234 / ISO 13909
Mechanical Sampling & Laboratory Testings

Quality Inspection Guide

Technical inspection manual governing independent third-party surveyor protocols, falling-stream mechanical sampling, 4-way sample splitting, and sealed referee arbitration custody.

Key Operational Focus
  • ISO 13909 / ASTM D2234 mechanical falling-stream sampling at conveyor discharge
  • Avoiding static stockpile sampling inaccuracies and moisture stratification
  • Accredited surveyor inspection (SGS, Sucofindo, Carsurin, Surveyor Indonesia)

International Coal Trading Glossary

Essential reference terminology for coal trading: commercial abbreviations, proximate analytical chemistry, maritime chartering formulas, and statutory compliance frameworks.

SHOWING: 24 OF 24 TERMS
Coal Specifications

GAR

Gross as Received

Gross calorific value including total moisture content. The universal commercial pricing benchmark for Indonesian thermal coal exports (e.g., GAR 3800, GAR 4200, GAR 5000+ kcal/kg).

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

NAR

Net as Received

Effective combustion heat output accounting for the latent heat of vaporization of water formed during combustion. Key metric for power plant boiler thermal efficiency calculations.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

ADB

Air Dried Basis

Analytical basis where moisture is measured after coal has reached equilibrium with ambient laboratory atmosphere, excluding surface moisture.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

ARB

As Received Basis

Analytical basis representing the coal condition at the moment of sampling in the physical cargo batch, including both surface (free) and inherent moisture.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

TM

Total Moisture

The sum of surface moisture and inherent moisture. Critical parameter affecting cargo weight determination, freight cost, boiler handling, and pulverization efficiency.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

IM

Inherent Moisture

Moisture held within the natural capillary pore structure of the coal seam, measured on an air-dried basis after free moisture has evaporated.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

Ash

Ash Content

Non-combustible inorganic residue remaining after complete combustion at 750°C–815°C. High ash reduces calorific yield and increases furnace bottom-ash/fly-ash loading.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

VM

Volatile Matter

Gaseous and condensable products released when coal is heated in the absence of air. Crucial for ignition speed, flame stability, and burner responsiveness in PC boilers.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

TS

Total Sulfur

Total sulfur content (pyritic, organic, and sulfate). Indonesian export coal is typically low in sulfur (0.15% to 0.8%), which reduces SOx scrubbing costs.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

HGI

Hardgrove Grindability Index

Empirical measure of coal resistance to crushing and pulverization in power station coal mills. Standard Indonesian export coals range between 45 and 60 HGI.

TRADE CONTEXT ASTM / INCOTERMS
Coal Specifications

AFT

Ash Fusion Temperatures

Four temperature thresholds (IDT: Initial Deformation, ST: Spherical, HT: Hemispherical, FT: Fluid) measuring ash melting behavior to prevent boiler wall slagging.

TRADE CONTEXT ASTM / INCOTERMS
Inspection & Documents

COA & COW

Certificate of Sampling & Analysis and Weight

Certificate of Sampling and Analysis (chemical parameters) and Certificate of Weight (determined via vessel initial/final draft survey), issued by accredited surveyors (SGS, Sucofindo).

TRADE CONTEXT ASTM / INCOTERMS
Shipping & Maritime

Laycan

Laydays and Cancelling Window

The agreed contractual window of days during which the chartered bulk carrier must arrive at the designated anchorage and tender valid Notice of Readiness (NOR).

TRADE CONTEXT ASTM / INCOTERMS
Shipping & Maritime

NOR

Notice of Readiness

Formal declaration tendered by the ship’s Master stating that the vessel has arrived at anchorage, has passed customs/quarantine, and is ready in all respects to load.

TRADE CONTEXT ASTM / INCOTERMS
Shipping & Maritime

WWD SHINC

Weather Working Days, Sundays and Holidays Included

Weather Working Days, Sundays and Holidays Included. Standard maritime charterparty laytime counting term for Indonesian offshore anchorage transshipment.

TRADE CONTEXT ASTM / INCOTERMS
International Trade

Demurrage

Demurrage and Despatch Provisions

Demurrage: agreed financial penalty paid by charterer/seller to shipowner for loading delays beyond laytime. Despatch: bonus earned if loading completes faster than laytime.

TRADE CONTEXT ASTM / INCOTERMS
International Trade

FOB MV Trimmed

Free On Board Mother Vessel Trimmed

Incoterms 2020 delivery term where seller pays all extraction, haulage, jetty handling, barging, and floating crane loading into the vessel holds, trimmed level.

TRADE CONTEXT ASTM / INCOTERMS
International Trade

FOB Barge

Free On Board Barge

Delivery term where seller’s risk and cost end once coal is loaded and trimmed onto the buyer’s barge at the river jetty terminal.

TRADE CONTEXT ASTM / INCOTERMS
International Trade

CFR & CIF

Cost and Freight / Cost Insurance Freight

Cost and Freight (CFR) or Cost, Insurance and Freight (CIF): seller procures ocean vessel chartering and marine insurance to the buyer’s destination discharge port.

TRADE CONTEXT ASTM / INCOTERMS
Banking & Statutory

DHE SDA

Devisa Hasil Ekspor Sumber Daya Alam (PP 21/2026)

Indonesian Government Regulation requiring the repatriation and escrow placement of natural resources export foreign exchange proceeds through licensed domestic banks.

TRADE CONTEXT ASTM / INCOTERMS
Banking & Statutory

ET Batubara

Eksportir Terdaftar Batubara (Registered Exporter)

Coal Registered Exporter (Eksportir Terdaftar Batubara) certification issued by the Ministry of Trade. PT-INI holds active license No. 03.ET-04.24.0202 valid through 2027.

TRADE CONTEXT ASTM / INCOTERMS
Banking & Statutory

MODI & MOMIB

Minerba One Data Indonesia (ESDM)

Minerba One Data Indonesia: official Ministry of Energy & Mineral Resources database tracking concession legitimacy, royalty payments, and active IUP-OP operational status.

TRADE CONTEXT ASTM / INCOTERMS
Inspection & Documents

PEB & NPE

Pemberitahuan Ekspor Barang & Nota Pelayanan Ekspor

Pemberitahuan Ekspor Barang (Customs Export Declaration) and Nota Pelayanan Ekspor (Customs Export Release Permit) issued by Indonesian Customs (Bea Cukai).

TRADE CONTEXT ASTM / INCOTERMS
Inspection & Documents

LS Minerba

Laporan Surveyor (Statutory Verification)

Mandatory technical verification report issued by an ESDM-appointed surveyor (e.g. Sucofindo/Surveyor Indonesia) verifying origin mine legitimacy before customs clearance.

TRADE CONTEXT ASTM / INCOTERMS

Corporate Document & Specification Library

Verified corporate credentials, statutory export licenses, technical grade sheets, and model commercial contracts available for instant viewing and direct PDF download.

Information Verification Standard:

Only verified regulatory filings and technical datasheets are published. Concession-specific mine deeds are provided following formal corporate KYC.

1. Company Profile & Statutory Credentials

Domestic investment company credentials, Ministry of Trade Registered Exporter approval, and BKPM/ESDM transportation & sales permits.

Corporate Dossier Verified

PT INI Corporate Profile (2026 Edition)

Official Corporate Dossier

Official company profile covering Domestic Investment Company corporate registration, IDR 15,000,000,000 paid-up capital, 21 partner concessions, 10 partner jetty terminals, leadership, and operational network.

PDF 3.54 MB
2026.1
Download
Statutory License Valid to 2027

Coal Registered Exporter License (ET Batubara)

Ministry of Trade Approval

Official Coal Registered Exporter approval No. 03.ET-04.24.0202 issued by the Ministry of Trade of the Republic of Indonesia, valid through 2027.

PDF 130 KB
No. 03.ET-04.24.0202
Download
Statutory License ESDM Verified

Coal Transportation & Sales License (IPP)

BKPM / ESDM Operating Permit

Risk-based operating license No. 81202142710160001 (KBLI 46610). PT-INI is verified in the Kementerian ESDM MinerbaOne portal (ID: 611426654341961888) as a registered coal trading company.

PDF 837 KB
No. 81202142710160001
Download
Field Inspection Fixed Rate

South Kalimantan Mine Site Visit Proposal

Itinerary & Pricing Dossier

6-stage technical site visit itinerary covering active open-pit mining operations, river stockpiles, jetty conveyor loaders, and fixed pricing (IDR 8,500,000/day for 1–4 delegates).

PDF 4.35 MB
V3.0
Download
Corporate Dossier Compliance

Buyer Statutory Due Diligence Checklist

Regulatory Framework

Checklist of Indonesian statutory permits: IUP-OP concession titles, ESDM MODI validation, e-PNBP SIMPONI royalty vouchers, Coal Registered Exporter approval, and PP 21/2026 DHE SDA banking.

Institutional Spec Full Dossier
2026 Compliance

2. Coal Product Specifications & Supporting Technical Materials

Calorific grade sheets (GAR 3800–6300+ kcal/kg), accredited surveyor testing certificates, and international coal sales term sheets.

Product Specifications Verified

Steam Coal Export Grade Sheets (GAR 3800–6300+)

Technical Specification Matrix

Proximate and ultimate analysis parameter sheets for low-grade, mid-grade, and high-CV export steam coal with ASTM/ISO test methods and boiler matching guidelines.

Datasheet 8 Analytical Grades
ASTM / ISO Baseline
Technical Materials Surveyor Standard

Independent Surveyor Testing Template (COA/COW)

Sample Inspection Report

Standard Certificate of Sampling & Analysis (COA) and Draft Survey Weight Certificate (COW) template format issued by accredited international surveyors (SGS / Sucofindo).

Template Report Surveyor Standard
ISO/IEC 17025
Technical Materials Commercial Terms

Standard International Coal SPA Framework

Commercial Term Sheet

Summary of standard FOB Mother Vessel and CFR sales contract clauses: quality adjustment formulas, moisture deduction rules, laytime WWD SHINC calculation, and dispute arbitration.

Contract Clauses Model Clauses
Incoterms 2020
Trade Desk & Commercial Allocation

Need procurement advisory or a cargo allocation?

Connect with our South Kalimantan operations and Makassar commercial desk to match calorific boiler baselines, confirm prompt laycan windows, or negotiate annual off-take supply structures.

FOB Kalimantan (Taboneo & Berau Roadsteads)
CFR / CIF Asian Coastal Discharge Ports
ASTM / ISO Independent Inspection Dossiers
Irrevocable Letters of Credit (L/C) at Sight
Trade Desk Inquiries Active 2026 Season
Verified Desk Response within 24h