Skip to main content
PT Intan Nusantara Indonesia HomePT Intan Nusantara Indonesia
Request Quote
Commercial Engagement Hub • 3 Action Pathways

Coal Procurement and Trade Support

Choose how you would like to work with us: request a spot quote, book an advisory call, or discuss an annual supply contract.

24-Hour Response21 Concessions (>22,292 Ha)10 Jetty Ports • 4 Anchorages
1. BUYPATHWAY 01

Request a Quote

For buyers seeking cargo allocations, price benchmarks, and laycan schedules.

2. ADVISEPATHWAY 02

Talk to an Advisor

For buyers seeking help with boiler specs, index pricing, or export regulations.

3. PARTNERPATHWAY 03

Discuss Supply Partnership

For utilities and industrial plants seeking recurring shipments or joint mining agreements.

End-to-End Trade Lifecycle • 12 Milestones

The 12-Stage International Buyer Journey

From initial specification inquiry to final destination port discharge.

01Origination

Requirement

Buyer Technical Specification

Buyer submits required calorific band (GAR/NAR), moisture and ash limits, total sulfur cap, delivery window, and discharge port draft limits.

Milestone Gate:Inquiry & ICPO Receipt
02Origination

Assessment

Boiler & Port Feasibility Review

Technical desk evaluates combustion compatibility, ash fusion temperatures (AFT), river transit timing, and discharge port draft constraints.

Milestone Gate:Technical Feasibility Confirmed
03Origination

Supply Matching

Concession Seam Allocation

We identify matching coal seams across our 21 partner concessions in Kalimantan, matching stockpile volume and crushing schedules to cargo specifications.

Milestone Gate:Concession Lot Reserved
04Commercial

Commercial Offer

Soft Corporate Offer (SCO)

Issuance of a formal Soft Corporate Offer (SCO) with FOB/CFR pricing indexed to ICI benchmarks, payment terms, and laycan windows.

Milestone Gate:SCO Counter-Signed
05Commercial

Due Diligence

Statutory & Corporate Audit

Exchange of corporate documents, verification of IUP-OP concessions on the ESDM MODI portal, royalty status checks, and mutual KYC clearance.

Milestone Gate:Compliance Verified
06Commercial

Contract / SPA

Bilateral Agreement & L/C

Execution of a bilateral Sales and Purchase Agreement (SPA) under Incoterms 2020. Buyer establishes an irrevocable letter of credit at sight or pays a T/T deposit.

Milestone Gate:Operative L/C Confirmed
07Execution

Cargo Allocation

Jetty Buffer & Barge Dispatch

Segregated coal is staged at the designated river jetty. Sizing is checked (0–50 mm) and conveyor loading onto 300ft/330ft river barges begins.

Milestone Gate:Barges En Route to Anchorage
08Execution

Inspection

Independent Surveyor Sampling

An accredited surveyor (SGS, Sucofindo, or Carsurin) takes mechanical falling-stream samples during loading per ISO 13909 and ASTM D2234.

Milestone Gate:Sample Split & Sealing
09Maritime

Vessel Nomination

Laycan & Bulk Carrier Acceptance

Buyer nominates the ocean vessel (Q88 particulars). Laycan is confirmed, the vessel tenders Notice of Readiness (NOR) on arrival, and holds are inspected.

Milestone Gate:NOR Tendered & Accepted
10Maritime

Loading

Offshore Floating Crane Stevedoring

Floating cranes (25–35 MT grabs) load cargo into vessel holds at Taboneo or Satui anchorages. Initial and final draft surveys determine certified weight (COW).

Milestone Gate:Draft Survey Completed (COW)
11Maritime

Shipping

Customs Release & Ocean Voyage

Customs export clearance (PEB/NPE) and Laporan Surveyor (LS) are issued. Clean On-Board Bills of Lading (B/L) are released as the vessel departs.

Milestone Gate:Clean Ocean B/L Issued
12Settlement

Delivery

Discharge & Final Settlement

Vessel arrives at the discharge port. Original documents are presented for bank negotiation under the letter of credit or T/T settlement.

Milestone Gate:Voyage Completed & Closed
Makassar Head Office • Trade Desk

Commercial Operations Desk

We handle quotes, letters of intent (LOI), advisory bookings, and supply contracts for power utilities and trading firms.

Commercial Trade Emailemail@pt-ini.com

Inquiries, specs, and quote requests

Official Contacts & Desk

Registered Tel: 0812-8622-002

WhatsApp Desk: +62 856-2400-8063

Quick questions on laycans and cargo availability

Corporate Headquarters

PT Intan Nusantara Indonesia

Graha Pena, Jl. Urip Sumoharjo No.20 5th floor, Pampang, Kec. Panakkukang, Kota Makassar, Sulawesi Selatan 90234

Hours: Mon – Fri, 09:00 – 18:00 WITA / WIB (UTC+8)

Inspect Operations Firsthand

Concession & Jetty Site Visit Experience

Prospective buyers are welcome to inspect our open pits, river stockpiles, and conveyor jetties in South Kalimantan.

Verified Corporate Credentials:

NIB: 8120214271016 • ET: 03.ET-04.24.0202 • PMDN Capital: IDR 15B • PP No. 21/2026 DHE SDA • Supervised by PT Danantara (DSI)

Request a Quote

Send us your specs and volume. Our trade desk will check current Kalimantan allocations and reply within 24 hours.

24-hour turnaroundSGS & Sucofindo verifiedConfidential
1. Company and Contact Details
2. Coal Grade and Specifications
3. Volume, Shipping, and Schedule
4. Additional Notes
Optional
Quick tags:
All inquiries are kept confidential.