Skip to main content
PT Intan Nusantara Indonesia Home PT Intan Nusantara Indonesia
Quote

Coal Trading and Shipping From Mine to Ship

From Kalimantan mines to ports overseas, with direct work with the mines, clear sales contracts, automatic conveyor loading at river jetties, and loading onto ocean ships in deep water.

10 barge-loading jetties Deep-water offshore anchorages One-time, trial, contract and KSO supply Loads up to 25,000 tons per day onto ships

Buying Directly From Mines or Through Brokers

Working directly with mines removes the risk of dealing with middlemen.

Buyers often meet chains of brokers who claim to own cargo but have no right to buy the coal and no checked stockpile set aside. PT Intan Nusantara Indonesia deals directly with licensed mining companies (IUP-OP and PKP2B permit holders).

Our sourcing team matches mining plans to the coal available at river jetties and to the main ship's loading dates. Every shipment we offer is tied to a specific mine layer, a set amount of road transport, and a checked stockpile lot.

Direct From Mine to Port

The coal is tracked at every step, from the weighbridge at the mine to the conveyor belt at the river.

Checks Before Loading

Independent lab testing before coal is loaded onto river barges.

How We Work With the Mines

1. Matching Coal Layers to the Mining Plan We review monthly mining schedules to find coal layers that match the buyer's energy content and moisture needs.
2. Separate Stockpiles We keep set coal lots apart at river terminals so they do not mix with other suppliers' coal or coal that does not meet the specs.
3. Barge Loading and Inspector Sampling SGS, Sucofindo or Carsurin take automatic samples from the falling coal stream throughout barge loading.
4. Loading the Ship and Weight Check Floating cranes load the ocean ship at offshore anchorages, and a draft survey (measuring how deep the ship sits) certifies the weight (COW).
Supply Options • Comparison

Supply Options Compared

Five supply options, from one-time or trial shipments to multi-year contracts priced against an index.

Option Typical Shipment Size Ship Size Loading Date Notice How Price Is Set Coal Set Aside
One-Time Shipment (Spot) Laycan allocated upon SPA execution and L/C issuance 50,000–75,000 tons per shipment Supramax / Panamax with their own cranes Book 21–30 days ahead FOB / CFR spot index price (ICI 3, ICI 4) or fixed price Stockpile checked quickly before shipping
Trial Shipment available to qualified overseas power company buyers 35,000 – 55,000 MT (Single Vessel) Handymax, or Supramax with its own cranes Book 25–35 days ahead Fixed price, paid at set stages A dedicated check of the coal layer and stockpile
Contract Supply Monthly parcel allocation aligned with mine pit extraction schedule 150,000–500,000 tons per contract period Fixed monthly loading dates Book 30–45 days ahead, rolling Monthly average of the ICI index A guaranteed monthly amount
Long-Term Supply (KSO) open to selecting strategic supply partners 500,000–1,200,000+ tons per year Ongoing ship schedule Yearly plan set 60+ days ahead Formula agreed between both sides, using several indexes, under the Joint Operation Coal layers reserved from specific mines
Buyer-Specific Sourcing made to the buyer's technical specs Custom shipments (50,000+ tons) Matched to your unloading terminal Mixing planned 30 days ahead Price tied to the coal quality Stockpile mixed from several mines
One-Time Shipment (Spot) OPTION 1

One-Time Shipment (Spot)

One shipment with a near-term loading date. Good for power companies covering an unexpected fuel shortage, or buying when spot prices are favorable.

Volume: 50,000–75,000 tons per shipment
Price: FOB / CFR spot index price (ICI 3, ICI 4) or fixed price
Notice: Book 21–30 days ahead
Supramax / Panamax with their own cranes Ask About This
Trial Shipment OPTION 2

Trial Shipment

For new overseas buyers who want to test how the coal works in their boiler, check the independent inspector's results (SGS/Sucofindo), and confirm document clearance before signing a long-term deal.

Volume: 35,000 – 55,000 MT (Single Vessel)
Price: Fixed price, paid at set stages
Notice: Book 25–35 days ahead
Handymax, or Supramax with its own cranes Ask About This
Contract Supply OPTION 3

Contract Supply

A supply agreement over several months or a year, with guaranteed monthly loading slots, so factories and independent power producers can plan their coal stock.

Volume: 150,000–500,000 tons per contract period
Price: Monthly average of the ICI index
Notice: Book 30–45 days ahead, rolling
Fixed monthly loading dates Ask About This
Long-Term Supply (KSO) OPTION 4

Long-Term Supply (KSO)

A multi-year agreement based on a joint mining operation (KSO) and coal reserved at the mine, with no middleman trader.

Volume: 500,000–1,200,000+ tons per year
Price: Formula agreed between both sides, using several indexes, under the Joint Operation
Notice: Yearly plan set 60+ days ahead
Ongoing ship schedule Ask About This
Buyer-Specific Sourcing OPTION 5

Buyer-Specific Sourcing

Coal mixed to meet strict boiler needs, such as sulfur limits, low volatile matter, or a high ash melting temperature (AFT).

Volume: Custom shipments (50,000+ tons)
Price: Price tied to the coal quality
Notice: Mixing planned 30 days ahead
Matched to your unloading terminal Ask About This
The Full Journey • Mine to Destination

From Mine to Ship

Every export shipment goes from the mine, along private haul roads, onto river conveyor belts, then onto ocean ships in deep water, and on to the unloading berth, with a check at each stage.

1

Mine

Pit Mining and Coal Layer Planning

South and East Kalimantan Coal Regions

Selective open-pit mining across 21 checked partner mines covering 22,874 ha. Studying the coal layers keeps energy content and basic quality steady.

What We Check

Coal layer profiling and basic quality tests at the mine

2

Stockpile and Sizing

Crushing and Separating

Mine Stockpiles

First and second crushers break coal straight from the mine (ROM) down to export size (standard 0–50 mm, at least 90%). Separate stockpiles stop different energy grades (GAR) from mixing.

What We Check

Infrared checks on pile temperature (to prevent self-heating fires) and drainage for rainwater runoff

3

Trucking

Private All-Weather Roads

Haul roads of 20 to 80 km

Double-trailer trucks (carrying 80 to 120 tons) use private roads that link mines directly to river jetties, so coal stays off public roads.

What We Check

Weighbridge accuracy checks, axle weight checks and GPS tracking of trucks

4

Jetty

Automatic Conveyor Barge Loading

12 Partner River Jetties

Automatic extendable conveyors load groups of 300 ft and 330 ft river barges at 600 to 1,200 tons per hour. Certified inspectors take automatic samples from the falling coal stream the whole time.

What We Check

Automatic conveyor sampling (ISO 13909 / ASTM D2234) and belt scales

5

River Transport to the Anchorage

Travel on Inland Waterways

Barito, Satui and Coastal Waterways

Tugboats and barges (7,500 to 10,000 DWT) travel along Kalimantan rivers to offshore deep-water anchorages, timed around the tides so there is enough water under the hull.

What We Check

Tide timing checks, river depth checks and barge load stability checks

6

Deep-Water Anchorage

Floating Crane Loading

Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan

Floating cranes with 25–35 ton grabs move coal from barges into ocean-going ships at 15,000 to 25,000 tons per day, with an inspector supervising the draft survey.

What We Check

Independent ship draft survey (COW), checks on how coal is leveled, and cargo hold cleanliness inspection

7

Ship to Destination

Ocean Voyage

Unloading Berths of Asian Power Companies

Loaded Supramax, Ultramax or Panamax ships clear Indonesian customs (PEB/NPE) and sail to power companies and industrial terminals in Asia and beyond.

What We Check

Clean on-board Bill of Lading issued, cargo hold temperature checks, and payment through the Letter of Credit

Protecting Quality • Environmental Care

How We Manage and Store Stockpiles

Keeping lots separate and watching temperatures protects the coal's energy content and moisture while it waits at river terminals.

See Testing Procedures
Keeping Grades Apart Separate Lots for Each Grade

Stockpile areas are divided into blocks by energy grade (Low 3800–4200, Mid 4500–5000, High 5800–6300) so grades do not get mixed by accident.

Preventing Self-Heating Fires Packing the Pile and Infrared Checks

Bulldozers press the pile down regularly so less air gets in. Heat cameras and probe thermometers find hot spots, and the oldest coal is used first (first in, first out).

Dust and Runoff Control Water Sprays and Settling Ponds

Automatic water spray guns along the fences keep coal dust down. Stockpile areas slope so runoff flows into settling and neutralizing ponds with several stages.

Stockpile Storage Capacity 50,000 – 250,000 MT Working Capacity

Storage capacity at each terminal ranges from about 50,000 to 250,000 tons of working stock. The exact amount in stock changes with the monthly mining schedule.

River Facilities • South Kalimantan Network

Jetty Barge Ports and Loading Details

Twelve river jetties load 300 ft and 330 ft barges along Kalimantan waterways, using automatic conveyors or machine loaders.

Jetty How It Loads Loading Speed Barge Sizes It Handles River Depth Limit Area Stockpile Size
PT TALENTA BUMI Automatic conveyor belt 800–1,000 tons per hour 300ft / 330ft (7.5k – 10k DWT) About 5.0–6.5 m (depends on the tide) Barito River area, South Kalimantan 120,000 – 180,000 MT
PT HASNUR JAYA UTAMA Automated Conveyor Belt 800 – 1,000 MT/Hr 300ft / 330ft (7.5k – 10k DWT) Approx. 5.0m – 6.5m (Tidal Window) Barito River entrance, South Kalimantan 150,000 – 200,000 MT
PT TAPIN COAL TERMINAL Fast automatic conveyor 800 – 1,200 MT/Hr 300ft / 330ft (7.5k – 10k DWT) Approx. 5.5m – 6.5m (Tidal Window) Tapin area, South Kalimantan 200,000 – 250,000 MT
CV CITRA Continuous conveyor 600 – 800 MT/Hr 250ft / 300ft (5k – 7.5k DWT) About 4.5–5.5 m (river depth) South Kalimantan area 80,000 – 120,000 MT
PT PELABUHAN SWANGI INDAH Loaded directly by excavator and hopper 200 – 300 MT/Hr 250ft / 300ft (5k – 7.5k DWT) About 4.5–5.5 m (coastal jetty) Tanah Bumbu coast 60,000 – 90,000 MT
PT PELABUHAN INDONESIA IV Automated Conveyor Belt 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m State-owned commercial port 100,000 – 150,000 MT
PT DUTA TUJUH BERSAUDAR SEJATI Automated Conveyor Belt 600 – 800 MT/Hr 250ft / 300ft (5k – 7.5k DWT) Approx. 4.5m – 5.5m South Kalimantan Basin 70,000 – 100,000 MT
PT MANDIRI CITRA BERSAMA Conveyor loading 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m South Kalimantan Basin 90,000 – 130,000 MT
PT SAIJAAN PRIMA COAL Loaded directly by machine 100 – 200 MT/Hr 230ft / 250ft (4k – 5.5k DWT) Approx. 4.0m – 5.0m Kotabaru coast 50,000 – 80,000 MT
JETTY MANURUNG Direct Mechanical Loading 100 – 200 MT/Hr 230ft / 250ft (4k – 5.5k DWT) Approx. 4.0m – 5.0m South Kalimantan Basin 50,000 – 75,000 MT
JETTY KSO ASAM ASAM Automated Conveyor Belt 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m Asam Asam, South Kalimantan 80,000 – 120,000 MT
JETTY IMCM Automated Conveyor Belt 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m South Kalimantan Basin 80,000 – 120,000 MT
Offshore Loading • South & East Kalimantan

Loading Anchorages and Locations

Deep-water offshore anchorages that PT Intan Nusantara Indonesia uses for ocean ship bookings, floating crane loading and certified draft surveys.

Anchorage 1 • TABONEO

TABONEO ANCHORAGE

S 03° 41' 57.95" - E 114° 27' 31.13

Main loading hub in South Kalimantan, with direct open-sea access for large floating cranes and loading of bulk ships.

Natural Water Depth: 14.0–18.0 m (deep open sea)
Ship Types Handymax, Supramax, Ultramax, Panamax
Loading Equipment: Large floating cranes (25–35 ton grabs)
Daily Loading: 15,000–22,000 tons per day
South Kalimantan river mouth / Java Sea entrance Open for loading dates
Anchorage 2 • ASAM ASAM

ASAM ASAM ANCHORAGE

3°57'56"S 115°7'36"E

Offshore loading point for mines in south-eastern Kalimantan, with shorter barge trips.

Natural Water Depth: 12.0–16.0 m (deep coastal water)
Ship Types Handymax, Supramax & Geared Panamax
Loading Equipment: Ship's own cranes with grabs, or floating crane
Daily Loading: 12,000 – 18,000 MT/Day
Tanah Laut / Asam Asam area Open for loading dates
Anchorage 3 • MUARA SATUI

MUARA SATUI ANCHORAGE

S 03° 57' 53.18" - E 115° 32' 47.21

Loading anchorage that takes coal from the Satui and Tanah Bumbu mining areas.

Natural Water Depth: 14.0–17.5 m (deep offshore)
Ship Types Supramax & Panamax Bulkers
Loading Equipment: Large floating cranes and barge fleets
Daily Loading: 15,000 – 20,000 MT/Day
Satui coast, Tanah Bumbu Open for loading dates
Anchorage 4 • TANJUNG PEMANCINGAN

TANJUNG PEMANCINGAN ANCHORAGE

S 03° 12' 37.29" - E 116° 16' 59.36"

A deep natural anchorage sheltered by Laut Island, which keeps loading conditions steady all year, even in monsoon swells.

Natural Water Depth: 16.0–22.0 m (sheltered deep channel)
Ship Types Panamax and Capesize
Loading Equipment: Two floating cranes / deep-water loading
Daily Loading: 18,000 – 25,000 MT/Day
Kotabaru / Laut Island channel Open for loading dates

Which Ships Fit Which Anchorage

Which ship types can load here, and what cranes they need, across the main bulk ship categories.

Ship Type Carrying Capacity (DWT) Maximum Depth in Water Cranes Typical Loading Time Anchorages That Fit
Handymax 40,000 – 50,000 DWT Approx. 11.5m – 12.0m With own cranes (4 × 30-ton) or without, using a floating crane 2.5 – 3.5 Days Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan
Supramax / Ultramax 50,000 – 65,000 DWT Approx. 12.5m – 13.5m With own cranes and grabs (10–12 cubic meters) preferred; floating crane can be used easily 3.0 – 4.5 Days All anchorages (Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan)
Panamax / Post-Panamax 70,000 – 85,000 DWT Approx. 14.0m – 15.0m Usually without own cranes; loaded by large floating cranes 4.0 – 6.0 Days Taboneo, Muara Satui, and Tanjung Pemancingan (deep channel)
Capesize 150,000+ DWT Approx. 17.5m – 19.0m Without own cranes; loaded by several floating cranes 8.0 – 10.0 Days Tanjung Pemancingan (sheltered deep channel)
Ship Charter Matching • Shipping Procedures

Naming Your Ship and Setting Loading Dates

Standard steps for naming the ship, giving notice that it is ready (NOR), and loading, designed to reduce the risk of late-loading penalties (demurrage).

STEP 1

Name Your Ship (21–30 days ahead)

The buyer sends the ship's details: name, IMO number, flag, year built, width and length, carrying capacity, hatch layout, crane capacity (the Q88 form), and the shipping agent.

STEP 2

We Accept the Ship and Narrow the Loading Dates

PT-INI checks the ship's size against the anchorage depth and floating crane clearance. The standard 10-day loading window is narrowed to 5 days at 15 days before arrival, and to a firm 3-day window 7 days before the ship's expected arrival (ETA).

STEP 3

Arrival Time Updates (10 / 7 / 5 / 3 / 2 / 1 days before)

The ship's captain sends the updated expected arrival time (ETA) to the port agent and the PT-INI operations team at set times: 10, 7, 5, 3 and 2 days, and 24 hours before reaching the anchorage pilot station.

STEP 4

Ready Notice (NOR) and Cargo Hold Inspection

When the ship anchors at the set location, it gives its ready notice (NOR, in forms such as WIPON/WIBON/WIFPON). Port health (Karantina Kesehatan), Immigration, Customs and an independent inspector check that the cargo holds are clean, dry and free of leftover cargo.

STEP 5

Loading and First Draft Survey

An independent inspector (SGS/Sucofindo) does the first draft survey before loading starts. Floating crane loading then runs non-stop, while the ship's balance and ballast water release are managed.

STEP 6

Final Draft Survey and Shipping Papers

When loading and leveling are finished, the final draft survey sets the certified weight in tons (Certificate of Weight, COW). The captain signs the Mate's Receipt, and the Clean On-Board Bill of Lading and export permits (PEB/NPE) are issued.

Shipping Documents We Provide

Clean On-Board Ocean Bill of Lading (B/L) Vessel Master / Ocean Carrier Agent

A transferable ownership document confirming the cargo is loaded in the ship's holds.

Mate's Receipt Issued by the ship's chief officer

An immediate confirmation of what was loaded, how much, and in what condition.

Certificate of Weight (COW) Issued by a certified independent inspector (SGS/Sucofindo)

Weight in tons confirmed by a draft survey of the ship.

Statement of Facts (SOF) Issued by the port agent and captain

A time-ordered log of the ready notice, loading time, weather and work shifts.

Certificate of Cargo Hold Cleanliness Issued by an independent marine inspector

Confirms the holds were dry, clean and ready to take steam coal.

Cargo Loading Plan and Leveling Declaration Issued by the ship's chief officer

How the weight is spread across each hold, to keep the ship safe and stable.

Kalimantan River Barges and Deep-Water Loading

Ready to Book Loading Dates or Arrange Barges?

Arrange tugboats and barges on the river, draft surveys, and floating crane loading onto ocean ships at the Taboneo, Asam Asam, Muara Satui, or Tanjung Pemancingan anchorages.

Taboneo, Asam Asam, Muara Satui & Tanjung Pemancingan
Crane loading of 15,000 to 22,000 tons per day
Daily Statement of Facts (SOF) tracking
Indonesian customs export clearance (PEB and NPE)
Anchorage slots open for the 2026 season Active

Our shipping team replies within 24 working hours.