Coal Trading and Shipping From Mine to Ship
From Kalimantan mines to ports overseas, with direct work with the mines, clear sales contracts, automatic conveyor loading at river jetties, and loading onto ocean ships in deep water.
Buying Directly From Mines or Through Brokers
Working directly with mines removes the risk of dealing with middlemen.
Buyers often meet chains of brokers who claim to own cargo but have no right to buy the coal and no checked stockpile set aside. PT Intan Nusantara Indonesia deals directly with licensed mining companies (IUP-OP and PKP2B permit holders).
Our sourcing team matches mining plans to the coal available at river jetties and to the main ship's loading dates. Every shipment we offer is tied to a specific mine layer, a set amount of road transport, and a checked stockpile lot.
The coal is tracked at every step, from the weighbridge at the mine to the conveyor belt at the river.
Independent lab testing before coal is loaded onto river barges.
How We Work With the Mines
Supply Options Compared
Five supply options, from one-time or trial shipments to multi-year contracts priced against an index.
| Option | Typical Shipment Size | Ship Size | Loading Date Notice | How Price Is Set | Coal Set Aside |
|---|---|---|---|---|---|
| One-Time Shipment (Spot) Laycan allocated upon SPA execution and L/C issuance | 50,000–75,000 tons per shipment | Supramax / Panamax with their own cranes | Book 21–30 days ahead | FOB / CFR spot index price (ICI 3, ICI 4) or fixed price | Stockpile checked quickly before shipping |
| Trial Shipment available to qualified overseas power company buyers | 35,000 – 55,000 MT (Single Vessel) | Handymax, or Supramax with its own cranes | Book 25–35 days ahead | Fixed price, paid at set stages | A dedicated check of the coal layer and stockpile |
| Contract Supply Monthly parcel allocation aligned with mine pit extraction schedule | 150,000–500,000 tons per contract period | Fixed monthly loading dates | Book 30–45 days ahead, rolling | Monthly average of the ICI index | A guaranteed monthly amount |
| Long-Term Supply (KSO) open to selecting strategic supply partners | 500,000–1,200,000+ tons per year | Ongoing ship schedule | Yearly plan set 60+ days ahead | Formula agreed between both sides, using several indexes, under the Joint Operation | Coal layers reserved from specific mines |
| Buyer-Specific Sourcing made to the buyer's technical specs | Custom shipments (50,000+ tons) | Matched to your unloading terminal | Mixing planned 30 days ahead | Price tied to the coal quality | Stockpile mixed from several mines |
One-Time Shipment (Spot)
One shipment with a near-term loading date. Good for power companies covering an unexpected fuel shortage, or buying when spot prices are favorable.
Trial Shipment
For new overseas buyers who want to test how the coal works in their boiler, check the independent inspector's results (SGS/Sucofindo), and confirm document clearance before signing a long-term deal.
Contract Supply
A supply agreement over several months or a year, with guaranteed monthly loading slots, so factories and independent power producers can plan their coal stock.
Long-Term Supply (KSO)
A multi-year agreement based on a joint mining operation (KSO) and coal reserved at the mine, with no middleman trader.
Buyer-Specific Sourcing
Coal mixed to meet strict boiler needs, such as sulfur limits, low volatile matter, or a high ash melting temperature (AFT).
From Mine to Ship
Every export shipment goes from the mine, along private haul roads, onto river conveyor belts, then onto ocean ships in deep water, and on to the unloading berth, with a check at each stage.
Mine
Pit Mining and Coal Layer Planning
South and East Kalimantan Coal RegionsSelective open-pit mining across 21 checked partner mines covering 22,874 ha. Studying the coal layers keeps energy content and basic quality steady.
Coal layer profiling and basic quality tests at the mine
Stockpile and Sizing
Crushing and Separating
Mine StockpilesFirst and second crushers break coal straight from the mine (ROM) down to export size (standard 0–50 mm, at least 90%). Separate stockpiles stop different energy grades (GAR) from mixing.
Infrared checks on pile temperature (to prevent self-heating fires) and drainage for rainwater runoff
Trucking
Private All-Weather Roads
Haul roads of 20 to 80 kmDouble-trailer trucks (carrying 80 to 120 tons) use private roads that link mines directly to river jetties, so coal stays off public roads.
Weighbridge accuracy checks, axle weight checks and GPS tracking of trucks
Jetty
Automatic Conveyor Barge Loading
12 Partner River JettiesAutomatic extendable conveyors load groups of 300 ft and 330 ft river barges at 600 to 1,200 tons per hour. Certified inspectors take automatic samples from the falling coal stream the whole time.
Automatic conveyor sampling (ISO 13909 / ASTM D2234) and belt scales
River Transport to the Anchorage
Travel on Inland Waterways
Barito, Satui and Coastal WaterwaysTugboats and barges (7,500 to 10,000 DWT) travel along Kalimantan rivers to offshore deep-water anchorages, timed around the tides so there is enough water under the hull.
Tide timing checks, river depth checks and barge load stability checks
Deep-Water Anchorage
Floating Crane Loading
Taboneo, Asam Asam, Muara Satui, Tanjung PemancinganFloating cranes with 25–35 ton grabs move coal from barges into ocean-going ships at 15,000 to 25,000 tons per day, with an inspector supervising the draft survey.
Independent ship draft survey (COW), checks on how coal is leveled, and cargo hold cleanliness inspection
Ship to Destination
Ocean Voyage
Unloading Berths of Asian Power CompaniesLoaded Supramax, Ultramax or Panamax ships clear Indonesian customs (PEB/NPE) and sail to power companies and industrial terminals in Asia and beyond.
Clean on-board Bill of Lading issued, cargo hold temperature checks, and payment through the Letter of Credit
How We Manage and Store Stockpiles
Keeping lots separate and watching temperatures protects the coal's energy content and moisture while it waits at river terminals.
Stockpile areas are divided into blocks by energy grade (Low 3800–4200, Mid 4500–5000, High 5800–6300) so grades do not get mixed by accident.
Bulldozers press the pile down regularly so less air gets in. Heat cameras and probe thermometers find hot spots, and the oldest coal is used first (first in, first out).
Automatic water spray guns along the fences keep coal dust down. Stockpile areas slope so runoff flows into settling and neutralizing ponds with several stages.
Storage capacity at each terminal ranges from about 50,000 to 250,000 tons of working stock. The exact amount in stock changes with the monthly mining schedule.
Jetty Barge Ports and Loading Details
Twelve river jetties load 300 ft and 330 ft barges along Kalimantan waterways, using automatic conveyors or machine loaders.
| Jetty | How It Loads | Loading Speed | Barge Sizes It Handles | River Depth Limit | Area | Stockpile Size |
|---|---|---|---|---|---|---|
| PT TALENTA BUMI | Automatic conveyor belt | 800–1,000 tons per hour | 300ft / 330ft (7.5k – 10k DWT) | About 5.0–6.5 m (depends on the tide) | Barito River area, South Kalimantan | 120,000 – 180,000 MT |
| PT HASNUR JAYA UTAMA | Automated Conveyor Belt | 800 – 1,000 MT/Hr | 300ft / 330ft (7.5k – 10k DWT) | Approx. 5.0m – 6.5m (Tidal Window) | Barito River entrance, South Kalimantan | 150,000 – 200,000 MT |
| PT TAPIN COAL TERMINAL | Fast automatic conveyor | 800 – 1,200 MT/Hr | 300ft / 330ft (7.5k – 10k DWT) | Approx. 5.5m – 6.5m (Tidal Window) | Tapin area, South Kalimantan | 200,000 – 250,000 MT |
| CV CITRA | Continuous conveyor | 600 – 800 MT/Hr | 250ft / 300ft (5k – 7.5k DWT) | About 4.5–5.5 m (river depth) | South Kalimantan area | 80,000 – 120,000 MT |
| PT PELABUHAN SWANGI INDAH | Loaded directly by excavator and hopper | 200 – 300 MT/Hr | 250ft / 300ft (5k – 7.5k DWT) | About 4.5–5.5 m (coastal jetty) | Tanah Bumbu coast | 60,000 – 90,000 MT |
| PT PELABUHAN INDONESIA IV | Automated Conveyor Belt | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | State-owned commercial port | 100,000 – 150,000 MT |
| PT DUTA TUJUH BERSAUDAR SEJATI | Automated Conveyor Belt | 600 – 800 MT/Hr | 250ft / 300ft (5k – 7.5k DWT) | Approx. 4.5m – 5.5m | South Kalimantan Basin | 70,000 – 100,000 MT |
| PT MANDIRI CITRA BERSAMA | Conveyor loading | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | South Kalimantan Basin | 90,000 – 130,000 MT |
| PT SAIJAAN PRIMA COAL | Loaded directly by machine | 100 – 200 MT/Hr | 230ft / 250ft (4k – 5.5k DWT) | Approx. 4.0m – 5.0m | Kotabaru coast | 50,000 – 80,000 MT |
| JETTY MANURUNG | Direct Mechanical Loading | 100 – 200 MT/Hr | 230ft / 250ft (4k – 5.5k DWT) | Approx. 4.0m – 5.0m | South Kalimantan Basin | 50,000 – 75,000 MT |
| JETTY KSO ASAM ASAM | Automated Conveyor Belt | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | Asam Asam, South Kalimantan | 80,000 – 120,000 MT |
| JETTY IMCM | Automated Conveyor Belt | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | South Kalimantan Basin | 80,000 – 120,000 MT |
Loading Anchorages and Locations
Deep-water offshore anchorages that PT Intan Nusantara Indonesia uses for ocean ship bookings, floating crane loading and certified draft surveys.
Main loading hub in South Kalimantan, with direct open-sea access for large floating cranes and loading of bulk ships.
Offshore loading point for mines in south-eastern Kalimantan, with shorter barge trips.
Loading anchorage that takes coal from the Satui and Tanah Bumbu mining areas.
A deep natural anchorage sheltered by Laut Island, which keeps loading conditions steady all year, even in monsoon swells.
Which Ships Fit Which Anchorage
Which ship types can load here, and what cranes they need, across the main bulk ship categories.
| Ship Type | Carrying Capacity (DWT) | Maximum Depth in Water | Cranes | Typical Loading Time | Anchorages That Fit |
|---|---|---|---|---|---|
| Handymax | 40,000 – 50,000 DWT | Approx. 11.5m – 12.0m | With own cranes (4 × 30-ton) or without, using a floating crane | 2.5 – 3.5 Days | Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan |
| Supramax / Ultramax | 50,000 – 65,000 DWT | Approx. 12.5m – 13.5m | With own cranes and grabs (10–12 cubic meters) preferred; floating crane can be used easily | 3.0 – 4.5 Days | All anchorages (Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan) |
| Panamax / Post-Panamax | 70,000 – 85,000 DWT | Approx. 14.0m – 15.0m | Usually without own cranes; loaded by large floating cranes | 4.0 – 6.0 Days | Taboneo, Muara Satui, and Tanjung Pemancingan (deep channel) |
| Capesize | 150,000+ DWT | Approx. 17.5m – 19.0m | Without own cranes; loaded by several floating cranes | 8.0 – 10.0 Days | Tanjung Pemancingan (sheltered deep channel) |
Naming Your Ship and Setting Loading Dates
Standard steps for naming the ship, giving notice that it is ready (NOR), and loading, designed to reduce the risk of late-loading penalties (demurrage).
Name Your Ship (21–30 days ahead)
The buyer sends the ship's details: name, IMO number, flag, year built, width and length, carrying capacity, hatch layout, crane capacity (the Q88 form), and the shipping agent.
We Accept the Ship and Narrow the Loading Dates
PT-INI checks the ship's size against the anchorage depth and floating crane clearance. The standard 10-day loading window is narrowed to 5 days at 15 days before arrival, and to a firm 3-day window 7 days before the ship's expected arrival (ETA).
Arrival Time Updates (10 / 7 / 5 / 3 / 2 / 1 days before)
The ship's captain sends the updated expected arrival time (ETA) to the port agent and the PT-INI operations team at set times: 10, 7, 5, 3 and 2 days, and 24 hours before reaching the anchorage pilot station.
Ready Notice (NOR) and Cargo Hold Inspection
When the ship anchors at the set location, it gives its ready notice (NOR, in forms such as WIPON/WIBON/WIFPON). Port health (Karantina Kesehatan), Immigration, Customs and an independent inspector check that the cargo holds are clean, dry and free of leftover cargo.
Loading and First Draft Survey
An independent inspector (SGS/Sucofindo) does the first draft survey before loading starts. Floating crane loading then runs non-stop, while the ship's balance and ballast water release are managed.
Final Draft Survey and Shipping Papers
When loading and leveling are finished, the final draft survey sets the certified weight in tons (Certificate of Weight, COW). The captain signs the Mate's Receipt, and the Clean On-Board Bill of Lading and export permits (PEB/NPE) are issued.
Shipping Documents We Provide
A transferable ownership document confirming the cargo is loaded in the ship's holds.
An immediate confirmation of what was loaded, how much, and in what condition.
Weight in tons confirmed by a draft survey of the ship.
A time-ordered log of the ready notice, loading time, weather and work shifts.
Confirms the holds were dry, clean and ready to take steam coal.
How the weight is spread across each hold, to keep the ship safe and stable.
Ready to Book Loading Dates or Arrange Barges?
Arrange tugboats and barges on the river, draft surveys, and floating crane loading onto ocean ships at the Taboneo, Asam Asam, Muara Satui, or Tanjung Pemancingan anchorages.
Our shipping team replies within 24 working hours.